Screens, cabinets and presentation equipment belong on the wall drawings from the start.

Drylining for an Eastwood meeting or commercial room should account for how the space will be used after the furniture and equipment arrive. New partitions establish the layout; wall linings provide the finished faces around it. Decide where equipment is fixed and how services reach it before the boards conceal their supports.
Allow for more than one furniture arrangement
Eastwood Hall’s operator describes conference rooms set out for cabaret and theatre-style seating, with audiovisual equipment available in the rooms. These published uses provide a practical example of why a room brief needs more than a single furniture sketch.
For your project, identify the arrangements that matter and test the proposed wall and door positions against each. Mark screen sightlines, storage access and the routes used when furniture is moved. This is particularly helpful where a new partition creates a smaller meeting space within a larger room. The final layout should work with the equipment people actually intend to use.
Schedule the items that will hang on the walls
A screen bracket, cupboard and small noticeboard place different demands on a wall. Provide their positions and fixing information so the selected partition or lining can incorporate suitable support. Allow for doors and services in the same area, rather than reserving an undefined patch of wall for equipment.
British Gypsum’s partition guidance calls for service penetrations and heavy fixtures to be established before framing. The actual support arrangement comes from the selected construction and fixture requirements. Record who supplies the bracket or support, who installs it and who checks the finished connection. Changes after boarding may require opening completed work and revising the detail.

Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Item | Include in the brief |
|---|---|
| Screen or display | Position, mounting arrangement and equipment details. |
| Cupboard or shelving | Intended loading and support requirements. |
| Socket or data outlet | Location relative to furniture and framing. |
| Door equipment | Opening, frame and any connected controls. |
| Future installation | Defined allowance or a separately designed later change. |
Coordinate cables and access without weakening the wall
Bring the electrical and data layout into the partition design before the frame is erected. Identify routes that pass through a wall and routes that can remain within the planned service space. Make accessible items such as controls and connection points part of the finished layout.
Where a wall has a fire or acoustic function, each service opening needs a suitable detail. The complete assembly matters, including what happens at the head and around the doorway. Ask the design team to resolve competing routes before installation. A convenient hole made for one trade can affect the arrangement another trade was expecting to deliver.
Separate presentation acoustics from room privacy
A meeting room may need clear speech inside it and reduced sound transfer to adjacent spaces. Describe both aims. Absorptive surfaces help manage reflected sound, while insulation depends on the boundaries and transmission paths between rooms. The two tasks need appropriate design evidence.
For a new enclosure, consider the door, surrounding walls, floor and ceiling junctions together. Establish whether a common void allows sound to travel around the proposed division. A manufacturer's published wall result relates to a specified assembly and assessment conditions; it should not become a guarantee of confidentiality in a room with unassessed connections.
Compare wall-lining approaches at the room edges
An existing masonry face may be suitable for direct bonding once its condition is established. For DriLyner Dab, the relevant manufacturer guidance calls for a suitable sound, dry background. Include the removal or repair of unstable finishes in the preparation scope rather than assuming the adhesive will hold them in place.
A separate framed lining can accommodate a different relationship to the background and services. Its support, finished depth and connection to adjacent construction still need designing. Compare window reveals, door surrounds and equipment positions under each option. The smallest quoted wall area is not enough to show which arrangement produces a workable finished room.
Judge the finish under the intended lighting
Presentation screens and wall lighting can make surface variations conspicuous. Agree the jointing or skim specification, decoration preparation and a sample area before finishing the room. Review it with the intended lighting and finish rather than relying solely on temporary site illumination.
Where existing linings are removed, obtain asbestos information covering the disturbance and arrange competent investigation for gaps. During finishing, assess and control sanding dust, including its effect on adjoining occupied spaces. Identify cleaning, reinstatement and inspection responsibilities. Leave time for drying and the decorator's preparation before equipment is fixed over the new surface.
Price the room and its equipment interfaces
Have the room plans and equipment schedule available when you call 01623 579297. Describe whether the project involves a new division, replacement linings or both, and agree how to provide supporting information. Add the intended furniture layouts and any restrictions on room closures.
The quotation should identify framing and boarding, fixture supports, openings, service coordination, finishing and making good. Ask which design information remains to be supplied before the scope is fixed. Also record who reinstates existing equipment and tests altered services. A clear division of responsibilities is useful when the drylining and audiovisual packages are appointed separately.
Questions and answers
Can screen fixings be added after the wall is decorated?
Some changes are possible, but the fixing must suit the actual wall and equipment. Supplying the mounting information before construction allows the support to be designed and inspected before it is concealed.
Will acoustic plasterboard make a meeting room private?
Board selection is one part of the wall specification. Privacy also depends on the door, junctions, service openings and other sound paths. Define the required result and have the complete room boundary assessed.
Local context
Eastwood Hall describes conference spaces arranged for both cabaret and theatre-style seating.
Eastwood Hall, EastwoodEvidence period: Undated published premises description, checked 21 November 2026 (UTC)Source checked: 21 November 2026Eastwood Hall conference roomsThe operator states that its conference rooms have audiovisual equipment.
Eastwood Hall, EastwoodEvidence period: Undated published premises description, checked 21 November 2026 (UTC)Source checked: 21 November 2026Eastwood Hall conference roomsSources and further reading
- Eastwood Hall conference roomsEvidence period: Undated current operator descriptionSource checked: 21 November 2026
- British Gypsum White Book GypWall Single Frame with introductionRelease/version: Mixed compilation: introduction8January2026; GypWallSingleFrame section1December2025Source checked: 21 November 2026
- British Gypsum White Book DriLyner DabRelease/version: 6 August 2024Source checked: 21 November 2026
- British Gypsum White Book GypLyner IndependentRelease/version: 6 August 2024Source checked: 21 November 2026
- Knauf UK acousticsRelease/version: Undated; checked 21 November 2026Source checked: 21 November 2026
- British Gypsum White Book System Design PrinciplesRelease/version: 11 September 2023 in relevant fire/acoustic/design sectionsSource checked: 21 November 2026
- British Gypsum White Book FinishesRelease/version: Mixed compilation: cover 6 August 2024, skimming 22 May 2025, jointing 13 November 2025Source checked: 21 November 2026
- HSE arranging an asbestos surveyContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: Pageupdated1March2021; checked21November2026Source checked: 21 November 2026
- HSE sanding plasterboard jointsContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: Pageupdated12November2024; checked21November2026Source checked: 21 November 2026