Drylining Nottinghamshire
Fire-performance specifications for Nottinghamshire drylining
Connect the required wall function to a documented construction and the details around it.

A fire-performance specification identifies what a partition or lining must achieve and the complete construction used to achieve it. For a Nottinghamshire commercial project, that begins with the building's fire design, the relevant requirements and the role of each wall. Board selection follows that information, together with the actual height, supports, openings and adjoining construction.
Establish why the wall needs a fire function
The project designer should identify whether a wall forms part of a protected route, compartment boundary or another fire-safety arrangement. Put that function and its requirements against a wall reference on the drawing. Different locations in the same building may need different treatment. A description that labels every board fire-rated does not explain what the completed construction is intended to do.
For buildings in England, Approved Document B provides fire-safety guidance, with Volume 2 addressing buildings other than dwellings. Its published collection includes amendments taking effect at different times, including future provisions. The project team needs the applicable edition and transition arrangements for the work. This decision belongs in the design record before a contractor is asked to price a particular wall.
Distinguish material reaction from construction resistance
Reaction to fire concerns the way a product contributes to fire development. Fire resistance concerns the performance of a building element under the relevant conditions. British Gypsum treats them separately in its design guidance. A board's reaction classification should not be read as a time rating for any wall assembled using that board.
State the required construction performance and the supporting system reference clearly. Keep the relevant classification, test or assessment information with the accepted specification, including its limits. The designer needs to establish that the evidence applies to the intended use. A product brochure headline or an image of similar-looking construction cannot replace that connection.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Record | What it needs to identify | Decision it supports |
|---|---|---|
| Project requirement | Wall function and applicable design criteria | What the construction must achieve |
| System evidence | Exact assembly and relevant scope | Which construction can be specified |
| Building detail | Height, supports and adjoining elements | Whether the assembly fits the site |
| Openings and junctions | Coordinated detail references | How continuity is maintained |
| Inspection plan | Checks before concealment and at handover | How the installed work is recorded |
Check the complete wall against the actual dimensions
Identify the framing, board layers, internal materials and finishing treatment in the system specification. Confirm the construction height and support conditions. British Gypsum's TGN123 explains that its fire-state maximum heights differ from cold-state limits. A height suitable for one assessment cannot simply be carried over to a different required performance.
Keep the system evidence relevant to the actual arrangement, including the direction of exposure where that matters. An independent lining, a partition boarded on both sides and structural protection are different constructions. If the available evidence does not cover the proposed detail, raise the design question before procurement. The answer may require a revised system or further assessment by the appropriate competent party.
Design the perimeter as carefully as the wall face
Show how the wall meets the floor, structure, adjoining walls and any ceiling. Identify movement requirements and the relevant head detail. The accepted design must remain workable at the real building junctions, including irregular or existing construction. Survey enough of those connections to establish the detail before the wall is closed.
Coordinate fire and acoustic requirements where they meet. The solution must address both without one trade altering a detail needed by the other. Assign responsibility for the design, installation and inspection of each interface. A clear drawing and scope boundary make it less likely that an essential junction is omitted because each contractor expects another package to include it.

Treat each penetration and opening as a design item
List the proposed doors, access panels, ducts, pipes and cable routes that interrupt the wall. Provide their actual products and dimensions to the relevant designers. The opening support and the closure around it need compatible details for the selected construction. Keep the service and drylining drawings coordinated as products and routes are finalised.
A later hole is a change to the wall, even if the visible opening is small. Have it reviewed before cutting and identify the appropriate reinstatement. Products described as fire stopping have defined applications; their description alone does not establish suitability for every penetration. The accepted detail should identify the complete arrangement and the party responsible for carrying it out.
Control changes while the construction is still visible
Record proposed changes to boards, studs, insulation, joint treatment and openings against the original specification. Obtain the relevant design acceptance before installation. Material availability or a similar appearance does not establish that a substitute preserves the system's evidence. Keep the revised information available to purchasing, the site team and the person inspecting the work.
Plan inspections before critical parts are concealed. Photographs are useful when they identify the wall, location, stage and relevant detail, but they form part of a wider record. Include the accepted drawings, product information and resolved design queries. An image folder by itself cannot certify that the complete construction meets its required performance.
Include the existing building in refurbishment decisions
Before altering an existing wall, establish its function and construction from records and appropriate investigation. Do not assume a previous partition is expendable because it is lightweight. The project team needs to understand the effect of the change on the building's fire arrangements and other relevant requirements.
Provide asbestos information before intrusive work. HSE's guidance requires the survey scope to match the proposed disturbance and be undertaken competently. Commercial clients also have duties under CDM 2015, including suitable management arrangements and pre-construction information. The drylining quotation should state the accepted work area and the investigations or enabling work that must be complete before installation proceeds.
Define the enquiry and the evidence required at handover
For a Nottinghamshire project, call 01623 579297 with the address, drawing references and available fire-design information. Explain whether the enquiry is for a specified installation or whether the design still has unresolved elements. Have the wall schedule, door and service information ready, and agree how to share it. This allows the scope and outstanding questions to be discussed together.
At quotation stage, identify the construction, interfaces, inspection responsibilities and handover records included. At completion, record the installed arrangement and any accepted revisions so that later maintenance or alteration can refer to it. Keep unresolved items visible until they are properly addressed. The purpose of the record is to support the building's ongoing management as well as the immediate handover.
Questions and answers
Does a fire-resistant board specify the whole partition?
No. The complete assembly, its dimensions, supports and junctions need supporting evidence for the required use. The board is one component of that construction.
Can services be added after handover?
They need to be assessed as an alteration to the existing wall. Identify its specification and obtain the appropriate opening and reinstatement detail before work begins.
Sources and further reading
- GOV.UK Approved Document B publicationContains public sector information licensed under the Open Government Licence v3.0.Release/version: Landing page updated 16 September 2026; includes future 2029 amendmentsSource checked: 21 November 2026
- British Gypsum White Book System Design PrinciplesRelease/version: 11 September 2023 in relevant fire/acoustic/design sectionsSource checked: 21 November 2026
- British Gypsum TGN123 maximum system heightsRelease/version: 30 August 2022Source checked: 21 November 2026
- British Gypsum White Book GypWall Single Frame with introductionRelease/version: Mixed compilation: introduction8January2026; GypWallSingleFrame section1December2025Source checked: 21 November 2026
- FIS introduction to dryliningRelease/version: Undated; checked 21 November 2026Source checked: 21 November 2026
- HSE arranging an asbestos surveyContains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: Pageupdated1March2021; checked21November2026Source checked: 21 November 2026
- HSE commercial client duties CDM2015Contains public sector information licensed under the Open Government Licence v3.0. Source: Health and Safety Executive.Release/version: 12 January 2026Source checked: 21 November 2026