Drylining Nottinghamshire

Discuss a Nottinghamshire drylining project

Call 01623 579297 with the address and the work you want to discuss.

Call 01623 579297

Illustrative cleared commercial room with newly lined walls awaiting decoration.

Start with the town or postcode and explain what is changing inside the building. It might be a new office layout, a lining to existing walls, an unfinished boarded room or a package within a larger refurbishment. Have the approximate extent and any available drawings ready so that the discussion can identify the next useful information.

For a new partition layout

Describe the rooms being created and the space they will divide. Note the full construction height, proposed doors and any equipment that will attach to the walls. If the project has fire or acoustic requirements, identify the issued specification or the person responsible for defining it.

Explain whether the building will be occupied and whether other trades are already appointed. The layout and the sequence should be discussed together, particularly where services cross the proposed wall or the work affects an existing access route.

For existing walls and linings

Identify the current background as far as it is known and explain why it is being covered or changed. Mention damaged finishes, known damp problems and any areas that have not been inspected. Photographs of the whole wall and its openings can help describe the scope, subject to an agreed way of sharing them.

Include retained skirtings, cornices, radiators and other fittings that could affect the new wall face. If an insulated lining is proposed, have the relevant design information available. A surface photograph alone will not settle the construction behind it or the suitability of a particular system.

Illustrative older interior with a retained plaster cornice and wall finish.

For finishing or a larger commercial package

For tape and jointing, describe the board condition, approximate area and intended decoration. Identify repairs or outstanding service work before discussing the finish. For a larger drylining package, state whether the enquiry covers material supply, installation or a defined labour scope.

Have the latest drawing references and an outline of site access ready. Mention delivery restrictions, stairs or lifts, storage and the rooms available for work. Agree which further documents are needed and how they should be provided during the call.

Useful information for the call
SubjectHave ready
LocationAddress, unit and floor
PurposeRoom use and reason for the work
ExtentApproximate dimensions and wall heights
DesignCurrent drawings and relevant requirements
ConditionKnown defects and available survey information
AccessOccupation, delivery and handling restrictions

Agree the next step during the call

The first discussion should identify the work, the information still needed and the appropriate next step. A programme or quotation depends on the actual scope and site arrangements. Keep any agreed actions with the project notes so that the follow-up uses the same details.

Use 01623 579297 for the project discussion. If drawings or photographs are needed, agree the transfer method during the call. This website does not provide a message-submission form.

Nottinghamshire local guides

Locations